Underground Dewatering Installation at Goldfields

Project Background

When a well-known gold mine in Western Australia’s Goldfields needed to open new areas underground, one challenge stood in the way: water. Groundwater management was critical to progress, and MTP’s service technicians were called in to deliver a reliable full-bore pump package deep below the surface.

What made this project extraordinary wasn’t just the technical complexity — it was the setting. Each day, the team arrived on site by light aircraft, descending into the rugged Goldfields before journeying 1.2 kilometres underground to tackle the job in near-total darkness.

Project Challenges

The mine presented an environment as unforgiving as it was fascinating. Humidity clung to the rock, temperatures soared, and dust and darkness reduced visibility to the beam of a head torch. Air quality shifted constantly, while the ground underfoot was wet, uneven, and unpredictable. On top of the physical environment, every step of the job required strict safety compliance. Equipment had to be tough enough to endure one of Australia’s harshest underground landscapes, yet precise enough to meet demanding technical and safety standards.

Project Solution

Flying in and out each day, the MTP service team quickly adapted to the mine’s rhythms. Early mornings began with safety briefings and pre-entry checks — PPE inspections, head torch readiness, and self-rescuer verifications became second nature.

Once underground, the team guided the installation of a bore pump at a site more than a kilometre below the surface, lowering it into a pre-drilled shaft plunging another 94 metres deeper. This wasn’t just a pump installation — it was engineering under pressure, in conditions few ever experience.

Key Components of the Solution

  • Grundfos Bore Pump Package – Purpose-built for deep underground performance. As an industrial partner of Grundfos, MTP ensured every detail was technically supported and optimised for reliability.
  • Angus Wellmaster WM250 Flexible Rising Main – Selected for its lightweight, coilable design and proven resistance to corrosion, scaling, and abrasion. Installed by MTP, a Wellmaster-certified installer, ensuring deployment to manufacturer standards for maximum safety and durability.
  • Protocols – From Job Safety Analysis approvals to hands-on checks, safety was woven into every step of the installation.

Why MTP?

Mining operations turn to MTP because the team thrives where others might hesitate. Our people combine technical expertise with on-the-ground adaptability, tackling complex environments with practical, innovative solutions. Whether on the surface or a kilometre underground, safety, efficiency, and precision remain at the core.

Project Outcome

Ready to unlock new potential underground?
Partner with MTP for proven dewatering solutions that keep your operations moving safely and efficiently. Get in touch today via 1800 950 276 or sales@mtp.com.au to see how we can help you stay ahead of the inflow challenge.


Read also

MTP’s New Website Is Live: A Fresh Look & Improved Experience
MTP’s New Website Is Live: A Fresh Look & Improved Experience
Read more

16 Jul 2025

Pumping Up Productivity: How Malcolm Thompson Pumps Helped Nordon Cylinders Halve Maintenance Time
Pumping Up Productivity: How Malcolm Thompson Pumps Helped Nordon Cylinders Halve Maintenance Time
Read more

16 Jul 2025

Custom Rebuild of Diesel-Driven Firefighting Pump  Power to Put Out Any Fire!
Custom Rebuild of Diesel-Driven Firefighting Pump Power to Put Out Any Fire!
Read more

15 Jul 2024